RE: Upgrade from SAP R/3 4.7 110 to ERP 6.0 EHP6

      Hi,

      Can anyone give me some idea on this upgrade:

      Details of Current Servers are:

       

      OS:- Windows Server 2003 (32 Bit)

       

      Database Version:- Oracle 9.2.0.8

       

      SAP: SAP R/3 ENTERPRISE 47X110 (Non-Unicode)

       

      Details of New Servers:

       

      OS:- Windows Server 2008 R2 (64 Bit)

       

      Database Version:- Oracle 11.2

       

      SAP: SAP ERP 6.0 EHP6

      Can anyone share best approach to complete this upgrade with optimized downtime.

      If we want to install same current version of SAP in Windows 2008 64-bit, we do not have DVD available for 4.7. PAM also says not supported.

      Please suggest Best approach.

      Thanks,

      Srikanth

      Hi Guys,   My upgrade is successfully completed.   I have followed below steps:   1. Upgrade Oracle to 11.2.0.3 on 4.7 32 bit server (Windows 2003) 2. Take export through SAPInst 3. Install SAP R/3 4.7 with Oracle 11.2 on 64-bit Server (Windows 2008 R2). Follow SAP Note 1478059 to install this server. 4. Import data which was taken from 32-bit server to this 64-bit server. 5. Run SUM to upgrade it to EHP6.   It is up to you whether you want to perform Combined Upgrade and Unicode conversion or first upgrade and then do Unicode conversion later.…

      User Rating: Be the first one !
      Some programmer dude Doctor Asked on November 2, 2016 in 60 upgrade.
      Add Comment
      1 Answers

        Hi Guys,

         

        My upgrade is successfully completed.

         

        I have followed below steps:

         

        1. Upgrade Oracle to 11.2.0.3 on 4.7 32 bit server (Windows 2003)

        2. Take export through SAPInst

        3. Install SAP R/3 4.7 with Oracle 11.2 on 64-bit Server (Windows 2008 R2). Follow SAP Note 1478059 to install this server.

        4. Import data which was taken from 32-bit server to this 64-bit server.

        5. Run SUM to upgrade it to EHP6.

         

        It is up to you whether you want to perform Combined Upgrade and Unicode conversion or first upgrade and then do Unicode conversion later.

         

         

        Thanks,

        Shrik