RE: Checks after phase MAIN_UPTRANS/STARTSAP_PUPG were negative!

      Hello all,

      I am upgrading ERP 6.40 to EHP6 on unix.

      During Execution Phase I get This error:

      Checks after phase MAIN_UPTRANS/STARTSAP_PUPG were negative!

      Last error code set: RFC login to system RIS ashost sapux24 nr 03 gwhost sapux24 gwservice sapgw03 failed with code 1 key RFC_COMMUNICATION_FAILURE: <br/> LOCATION CPIC (TCP/IP) on local host with Unicode<br/> ERROR partner ‘sapux24:3303’ not reached<br/> TIME Sat May 25 15:33:39 2013<br/> RELEASE 720<br/> COMPONENT NI (network interface)<br/> VERSION 40<br/> RC -10<br/> MODULE nixxi.cpp<br/> LINE 2897<br/> DETAIL NiPConnect: 10.76.3.166:3303<br/> SYSTEM CALL connect<br/> ERRNO 239<br/> ERRNO TEXT Connection refused<br/> COUNTER 60<br/> <br/> System start failed.

      ———————————————————————————–

      Last part of sapup.log file

      CURRENTPHASE MAIN_UPTRANS/REQ_ASCS_SWITCH
      …started at 20130525134615
      # Phase REQ_ASCS_SWITCH skipped due to condition(s) ‘WITH_HAREMOTE’
      ..finished at 20130525134615 with status SKIPPED.

      CURRENTPHASE MAIN_UPTRANS/STARTSAP_PUPG
      …started at 20130525134615
      # Database archive mode enabled at 20130525134727
      …begin dialog at 20130525134727
      …end dialog at 20130525153015
      # Phase error status set: NO SYSTEM START
      ..times self: 0.010000/0.140000 usr/sys, children 1.400000/1.570000 usr/sys.
      ..finished at 20130525153359 with status FAILED.
      # Error message set: ‘RFC login to system RIS ashost sapux24 nr 03 gwhost sapux24 gwservice sapgw03 failed with code 1 key RFC_COMMUNICATION_FAILURE:
      LOCATION    CPIC (TCP/IP) on local host with Unicode
      ERROR       partner ‘sapux24:3303’ not reached
      TIME        Sat May 25 15:33:39 2013
      RELEASE     720
      COMPONENT   NI (network interface)
      VERSION     40
      RC          -10
      MODULE      nixxi.cpp
      LINE        2897
      DETAIL      NiPConnect: 10.76.3.166:3303
      SYSTEM CALL connect
      ERRNO       239
      ERRNO TEXT  Connection refused
      COUNTER     60

      System start failed’
      …begin dialog at 20130525153406

      Any help

      Thanks

      Hi,   Problem is Solvet by restart DB.   thanks

      User Rating: Be the first one !
      alex Default Asked on November 2, 2016 in 60 upgrade.
      Add Comment
      1 Answers

        Hi,

         

        Problem is Solvet by restart DB.

         

        thanks

        Add Comment